    An office fit-out differs from residential work in three ways: it is governed by quantitative standards, noise becomes a functional problem rather than an annoyance, and the work often has to proceed while the business keeps running. This guide covers all three.

    02

    Area and zoning

    Indicative office area guidelines per employee
    Indicative planning figures

    The main planning error is zoning for today headcount. An office typically serves the same company for three to five years, and teams grow over that period. A project should carry 20–30% of built-in slack — the ability to add desks, not empty floor area.

    Shared space — meeting rooms, kitchen, break areas — takes roughly a quarter of the total. Less than that and meetings spill into the work area, which disrupts everyone.

    03

    Acoustics, the most frequently ignored element

    Comparison of office acoustic solutions by effect and cost
    Solutions by effect and cost

    The problem in open plan is not the level of noise but its intelligibility: once you can make out the words of a nearby conversation, concentration goes. That is why acoustic ceilings and panels work — they reduce reflection and render speech indistinct.

    The practical minimum: an acoustic ceiling in the open area and panels in meeting rooms. Together those two deliver most of the benefit at the most sensible cost.

    04

    Where the project should start

    Six questions an office fit-out project should start with
    Six questions before planning begins

    Network and power requirements matter particularly: each workstation needs at least two power and one data outlet, meeting rooms need screen power and an HDMI route, and a server room needs a dedicated supply and cooling.

    05

    Programme and staying operational

    If the office has to keep running, the project must be broken into phases so that only one zone is closed at a time. Noisy work — chasing, strip-out — is scheduled outside working hours, which lengthens the programme but keeps the business going.

    A full fit-out of a typical 150–250 m² office takes two to three months in vacant space, and three to five months alongside an operating business.

    06

    How the brief for an office fit-out has changed

    The brief for an office fit-out has shifted because working patterns have. Under a hybrid model only 50–70% of staff are present at any time, which means a proportion of fixed desks stands permanently empty.

    There are two answers to that. One is reducing floor area and moving the saving into shared space. The other is flexible desking, where no desk belongs to a specific person. Both have to be decided at design stage, because they demand different infrastructure.

    In an open plan office, quiet zones matter especially — small spaces for one or two people, for calls and concentrated work. Without them open plan simply destroys focus.

    07

    Air quality and productivity

    Air quality in an office has a direct effect on the quality of work. CO₂ concentration rises quickly in a closed space, and elevated levels measurably reduce attention. The effect is most pronounced in meeting rooms, where many people occupy a small volume.

    The answer is mechanical ventilation with CO₂ sensing, modulating supply according to occupancy. That system has to be designed in from the start — retrofitting it means stripping the ceiling completely.

    08

    Decisions that precede the design

    • Fixed or flexible desking
    • How many quiet zones and meeting rooms
    • Ventilation type and whether CO₂ control is included
    • Network architecture and where the central node sits

    All four affect construction decisions, which is why an office fit-out begins with these questions rather than with choosing furniture.

    09

    Frequently asked questions

    10

    Open plan or private offices?

    It depends on the work. Development, analysis and design demand concentration, which means either private offices or open plan with serious acoustic treatment and quiet zones. Sales and support suit open plan better.

    11

    Who pays — tenant or landlord?

    That is settled in the lease. Common practice is for capital works to fall to the landlord and interior fit-out to the tenant. What matters is recording in advance what stays in the premises when the lease ends.

    12

    How important is lighting?

    Very. Work surfaces need adequate, even light without flicker. Poor lighting is the most common cause of fatigue and the cheapest to put right.